Related
More case studies
-
Engineering design for HumeLink transmission corridor
Detailed engineering and design management services for the 500kV HumeLink transmission line linking Wagga Wagga, Bannaby, and Maragle.
New South Wales
-
Upgrading 622km of natural gas pipeline to bidirectional flow
End-to-end engineering and construction to enable reverse gas flow across Jemena's 622km Northern Gas Pipeline in under 8 months.
Northern Territory and Queensland
-
Brownfield transmission substation upgrade - South Australia
EPCM delivery of a major brownfield substation upgrade to support increased renewable generation flows into the South Australian grid.
South Australia