Related
More case studies
-
Overhead line reconductoring across greater Sydney
Systematic reconductoring programme to increase capacity and resilience across Ausgrid's high-voltage distribution network.
Greater Sydney, NSW
-
Brownfield transmission substation upgrade - South Australia
EPCM delivery of a major brownfield substation upgrade to support increased renewable generation flows into the South Australian grid.
South Australia
-
Network operations and maintenance - ACT
Comprehensive network operations and maintenance services for Evoenergy's electricity distribution network across the Australian Capital Territory.
Australian Capital Territory
Related
More case studies
-
Overhead line reconductoring across greater Sydney
Systematic reconductoring programme to increase capacity and resilience across Ausgrid's high-voltage distribution network.
Greater Sydney, NSW
-
Brownfield transmission substation upgrade - South Australia
EPCM delivery of a major brownfield substation upgrade to support increased renewable generation flows into the South Australian grid.
South Australia
-
Network operations and maintenance - ACT
Comprehensive network operations and maintenance services for Evoenergy's electricity distribution network across the Australian Capital Territory.
Australian Capital Territory